Page 1 of 1

bbest small problem

Posted: Sat 23 Feb, 2008 12:01 am
by greenfields
hi i downloaded the bbest tonight i am on the computor all night having agreat time .
the problem i am having is if someone wanted a box frame this will mean you need two frames like a scoop and a outer frame .
how do you get the calculations with out doing this two times .

i cant get this to work ,if i price for a scoop this is one job then i have to price for the outer frame this is two jobs where am i going wrong

thankyou greenfields :?:

Posted: Sat 23 Feb, 2008 4:47 am
by John
Hi Greenfields,

No need to enter the mouldings one at a time. Enter them all at once, separated with a plus sign (no spaces), with the innermost frame first.

Posted: Sat 23 Feb, 2008 1:40 pm
by fionnuala
John you really should have a lie in sometime!!!!
4.47 am :o

Posted: Sat 23 Feb, 2008 2:43 pm
by John
Fionnuala, when life is just one long holiday, like mine is, you don't want to miss any of it by sleeping half of it away. :D

Also, the early start means a blissful dash to work in under 15 minutes instead of the frustration of negotiating the morning snarl-up for over an hour.

Anyway, Saturday's a short day, we close a bit earlier than the rest of the week. And I have the whole of Sunday to recuperate, loafing about, walking the dog, watching the Antiques Roadshow, etc.